Decking repair

Decking repair

A quick and easy repair to a 10 year old deck. This area has a lot of water from an outside tap and the boards nearby have aged poorly, I cut and removed them, installed a new substructure as the deck floats over an old patio, and then cut 3 new boards to fit. This...
Garden Fence

Garden Fence

This 6 bay garden fence was nice to do, I used new galvanised metal fixings on the old and original concrete posts, this saved the client some money and me digging a load of holes!
Drainage channel in Old Town

Drainage channel in Old Town

This morning I cut a 4″ gully at the edge of a patio that kept getting waterlogged, it’s nearly a foot deep and reaches soil beneath, so it should have capacity for a heavy downpour and still drain away, I filled it up with gravel that lets the water flow...
Oak Sleeper Retaining Wall

Oak Sleeper Retaining Wall

Part of a larger project, this retaining wall from oak sleepers needed to be strong but maintain a smooth curve round the reshaped driveway. I dug a deep trench and concreted the sleepers sourced from a West Sussex mill in with a drainage pipe behind to ensure minimal...
New level front path

New level front path

My client wanted a new front path for their rental property, the old one was unlevel and was made with a variety of different materials including some very slippery wall tiles that were lethal in the rain. The other side paths already had paths made with 450mm square...