A 2 day install of an engineered oak floor. I started by leveling up the old floor, removing any protrusions and making sure the floor was as clean as possible. Then some insulation panels were put down with a section of electric underfloor heating mat wired in too. Next is the fitting of the oak planking leaving a small gap around all edges, I cut the kitchen units end panels so that the floor just tucks underneath. This was fitted into the kitchen, dining room, hallway, downstairs toilet and into the cupboard beneath the stairs. All the gaps at the edges were covered with some matching oak trim which takes a long time as there are so many unique angles to deal with, plus this trim must allow the boards to move beneath slightly with temperature expansion.
Categories
Recent Posts
Archives
- July 2024
- May 2024
- April 2024
- March 2024
- August 2023
- July 2023
- June 2023
- April 2023
- March 2023
- September 2022
- August 2022
- June 2022
- May 2022
- March 2022
- February 2022
- December 2021
- November 2021
- August 2021
- July 2021
- June 2021
- May 2021
- April 2021
- March 2021
- February 2021
- November 2020
- July 2020
- June 2020
- January 2020
- November 2019
- July 2019
- June 2019
- May 2019
- April 2019
- February 2019
- January 2019
- December 2018
- November 2018
- September 2018
- May 2018
- March 2018
- February 2018
- September 2017
- June 2017
- September 2016